Nowhere is this more evident than in the delivery of the first standalone power system (SPS) upgrades for FY2025-26 communities at Embalgun, Kandiwal and Four Mile. These projects are being delivered through a standardised,
containerised standalone power system model, engineered in Western Australia specifically for Kimberley conditions.
At the heart of this approach is KRSP’s Perth-based manufacturing workshop, where the bulk of container fabrication, equipment integration and testing is undertaken. By completing this work locally, the program achieves consistent quality assurance, structured testing and reduced exposure to construction risks in remote locations, while keeping capability and investment in WA.
Local procurement is embedded through a competitive, compliance-driven Request for Quote (RFQ) process, with KRSP awarded the work as a contractor that is 50 per cent Aboriginal owned via Marra Worra Worra. Across two procurement rounds, KRSP has demonstrated strong capability, compliance maturity and performance - delivering value-for-money outcomes alongside meaningful Aboriginal participation.
From engineering and fabrication through to transport, logistics, civil works, electrical installation and remote commissioning, WA-based contractors are engaged across the full delivery lifecycle. This reduces interstate supply chain dependencies and ensures Western Australian expertise remains central to modernising ageing power infrastructure in remote communities.
Importantly, this is not a one-off solution. Future SPS rollouts across the Kimberley will use the same repeatable, containerised model, locally engineered and manufactured in WA, building momentum, capability and confidence with each deployment.